Commercial paving

Parking Lot Paving in Orlando

New parking lots and full replacements for Orlando retail centers, offices, HOAs and industrial yards, phased or paved at night so you never fully close.

Get a Free Paving Quote

We'll call back to set up a site visit.

Freshly striped asphalt parking spaces

Short answer: a new or replacement asphalt parking lot costs an estimated $2–$4.50 per square foot. The range moves with the condition of the base, the asphalt thickness, how much old pavement has to come out, and whether the work has to be phased or done at night.

When a lot needs replacing, not resurfacing

  • Alligator cracking (a pattern like reptile skin) across large areas.
  • Ruts and soft spots where trucks turn or park.
  • Potholes that come back in the same place after patching.
  • Water that sits in low areas for hours after a storm.

Those all point to a failed base. A fresh layer of asphalt over a failed base cracks along the same lines, so these sections need the base rebuilt. If the base is sound, resurfacing is the cheaper fix.

How we build a lot

  1. Remove the old asphalt where the base has failed.
  2. Rebuild and compact the base. In Florida that's usually a crushed limerock base over a compacted subgrade.
  3. Set the grade so water runs to the drains instead of pooling.
  4. Pave and compact hot-mix asphalt, thicker where trucks and dumpsters travel.
  5. Stripe stalls, arrows, fire lanes and accessible spaces as soon as the surface is ready.

Keeping the lot open

We phase work so part of the lot is always usable, keep entrances and fire lanes clear, and pave at night or on weekends when the property can't close. Tenants get written notice with dates before any stall closes.

Summer scheduling

Orlando's rainy season runs roughly June through September, with storms most afternoons. We plan paving for mornings and dry stretches in summer, and keep the schedule flexible so a storm doesn't leave a half-finished section open.

These prices are estimates from published national paving cost data. Your quote is itemized by area, thickness and prep after we measure. See the Orlando asphalt price guide.

Questions

How long does a parking lot repave take?

A small lot can be done in a day or two. Larger lots are phased over several days or nights so part of the lot stays open.

Do you stripe the lot after paving?

Yes. Striping, arrows, fire lanes and accessible spaces are part of the job, laid out to current rules.

Can you pave around business hours?

Yes. Night and weekend paving is normal for retail, medical and office lots.

Get a paving quote this week

Call or send the form. We'll set up a free site visit and have a written number back to you fast.

Call nowFree quote